Kore · Master Build Log

The development record, kept honest.

Fourteen linked records covering the Kore Vision from concept to commercial readiness: the dated build history, an executive dashboard, product and decision registers, risks, costs, and funding requirements. Built to survive due diligence. Every claim traceable; everything unverified marked as such.

Status: In development Stage: Pre-prototype Raise: $30,000 Records: 14

Pre-prototype. Concept stage.

Read this first

Kore is pre-prototype. There is no finished hardware yet and no revenue. What exists: a defined architecture, a hardware path, university engineering conversations, a live website, product concept renders, and a crowdfunding campaign for the first build. This log distinguishes what is built from what is planned. Fact marks verified events, Estimate marks third-party figures and projections, and Not yet measured marks what does not exist yet. Nothing here is a partnership until both sides say so.

Record 01

Master Build Log

The chronological record of every meaningful development activity, from origin through today. Newest entries are added at the end of the timeline, above Planned.

December 2025

OriginThe work begins

Kore starts as a vision: homes that protect the people inside them. Early development runs on two tracks, the sensing hardware vision and a sustainable-manufacturing track exploring upcycled materials, community micro-factories, and a circular material economy.

September 2026

ArchitectureThe system gets its shape

The Kore architecture is locked: Root (the hub), Seeds (modular sensors), and the expanding vision built on top. "Keeping Our Roots Enriched" becomes the working name and mission.

  • Hardware path defined around the ESP32: CO2, particulate matter, VOC, temperature, humidity, pressure, and moisture sensing, with WiFi connectivity.
  • Kore Intelligence framed as six capabilities: Sense, Learn, Detect, Connect, Protect, Insight.
  • Personal Intelligence defined as the individual layer: each person owns a private file of sensed rhythms, shared with doctors or family only by explicit opt-in.
  • Brand identity created: forest green and warm cream.

September 24 – 26, 2026

OutreachUniversity engineering conversations open

First contact with university capstone programs about a Kore build partnership:

  • Georgia Tech Mechanical Engineering Capstone
  • UGA College of Engineering Capstone (2027–2028 cycle opens January 2027)
  • Kennesaw State, Georgia Southern (senior-design sponsorship quoted at $2,500/semester)
  • RPI Design Lab, Purdue, Cal Poly

First version of the website goes live. The Kore brand asset library is created.

October 1 – 2, 2026

DesignProduct renders and visual language

Concept product renders produced for the Root hub and Seed sensor family, plus the Kore Pixel Style for concept films. A $18,000 full-build quote is received from a product design firm; the decision is made to pursue the leaner university-partnership path instead.

October 4, 2026

ProposalsCapstone proposals submitted

  • RPI capstone sponsorship form submitted for Spring 2027.
  • Purdue Spring sponsorship package sent.
  • Joules Accelerator Cohort 18 application submitted.

October 5, 2026

PivotUltra-surveillance positioning

The positioning sharpens: Kore is a full ultra-surveillance safety system, cameras included, for unmatched safety and documentation. A camera-free option remains for schools, churches, and senior living. First Seed Presence concept render completed.

October 6 – 7, 2026

FundingThe $30,000 raise opens

The GoFundMe campaign launches: "Building Kore: A Home That Senses Danger Before It Strikes," goal $30,000, to fund the V0.1 prototype build. The Kore Vision statement is written: "Mind, body, and money are one system. The room is the interface."

Penn State Learning Factory fit call scheduled for October 6; Freeside Atlanta open house planned for October 6. Outcomes to be logged here.

October 8, 2026

Launchthekorevision.com goes live

  • Domain registered; full site deployed with 30-section luxury overhaul: the problem, verified statistics, the five-step Kore Loop, technology specs, roadmap, and funding.
  • Working email signup forms wired to the site.
  • 60+ tailored outreach emails sent to pilot partners, press, podcasters, and funders.
  • Auburn University Engineering proposes a meeting (Oct 16).
  • Embedded.fm (podcast) asks for proof of work, which is why this log exists.

October 10, 2026

MediaHospital safety commercial produced

43-second concept commercial: patients in a hospital ward, what the room hides (stale air, unwitnessed falls, unheard distress at night), Kore sensing and documenting, the alert reaching doctors in time, then the change: safer patients, stronger staff, better economics. Rendered in widescreen and vertical cuts; the widescreen version is self-hosted below.

  • All statistics cited on screen: indoor air 2 to 5x worse (EPA), 1 in 4 seniors falling each year (CDC), 400+ CO deaths a year (CDC).
  • Founder fact pop-ups pause each section; sensor scenes are labeled as concept visualization. This is pre-prototype work, not a product.
  • Published as a Reel on Instagram at @thekorevision; a video update on the GoFundMe campaign points there (GoFundMe updates accept photos or YouTube video, not direct uploads); YouTube uploads of both cuts are in progress.
Concept film

October 11, 2026

LaunchSite rebuilt: five pages, new media, marketing engine

The single long homepage was restructured into five focused pages: Home, How it works, System, Compare, and FAQ. The email signup moved to the top of the homepage, the five-step Kore loop appears once, and the funding ask repeats.

  • Six cinematic concept videos generated (hero plus fall, fire, break-in, air quality, and morning scenes) and nine new images, all labeled concept, pre-prototype.
  • New homepage sections: "How Smart Is Your Home?" quiz lead magnet, "One founder. One laptop. Zero quit." founder story, and the Founding 500 referral ladder with milestone rewards.
  • Site icon added to all pages; search engines pick it up on their next crawl.
  • Technical round: security headers, sitemap.xml, robots.txt, Schema.org structured data, social sharing previews, canonical URLs, and faster font loading.
  • Research published: 50 website features reverse-engineered from the top smart-home sites, and 50 media marketing tactics from top brands, each with a Kore adaptation.
  • Investor-grade Master Build Log created: 14 linked records with an honest baseline. No prototypes, no test results, no team beyond the founder; everything unverified is marked as such.

October 11, 2026

MediaDaily Double episode 1: "The 40-second burglary"

First episode of "31 Nights of Safer Homes": a 48-second vertical Short on what a break-in really looks like, with the cited FBI burglary figure and concept-visualization labels on tech scenes.

  • Published to TikTok; flagged under review on upload, visible after review clears.
  • Instagram upload rate-limited; YouTube upload blocked by the channel's daily limit. Both to be completed when limits reset.

October 11, 2026

LaunchKoreBoard and Kore Structures product pages published

Published KoreBoard and Kore Structures product pages. KoreBoard page transcribes the founder's spec sheet (Kore Design Team, rev 1.0): upcycled multi-layer building panel, concept stage. Structures page documents the 8-step airform dome method from upcycled plastic, rubber, and fiber; no structures built. Both pages labeled concept, pre-prototype.

October 11, 2026

LaunchThe Kore Family page: five product lines, one closed loop

Published the Kore Family page (/family): a layered scroll experience presenting the five product lines in founder-set order, KoreBoard first, KoreBin second, then Kore Structures, Kore Root + Seeds, and Kore Intelligence. Includes the material-flow strip (Waste to KoreBin to Ore to KoreBoard to Structures to Sensors) and a grant-funder band on circular economy, waste diversion, affordable sustainable housing, and local manufacturing potential, all in designed-to language with concept stage, pre-prototype, pre-revenue explicit. Homepage gained a five-card family teaser. No invented metrics anywhere on the page.

Next

PlannedWhat happens from here

  • October 14: Decatur Makers visit, scouting a build night for the first prototype.
  • October 16: Auburn Engineering meeting on the capstone proposal.
  • V0.1 prototype: the smallest one-room proof of the Kore loop, sense, compare to baseline, apply one countermeasure, verify, record. Parts list and wiring plan in progress.
  • Funding: $30,000 GoFundMe active; grant and fellowship applications in flight (D-Prize, Activate Fellowship, MIT Solve).

October 11, 2026

NarrativeWhy the world needs the Kore Vision

New page /why-kore lays out the founder's narrative in order: the ore (KoreBin waste-to-ore feedstock), Kore credit (concept-only internal unit, $1.00 face value target, not real currency), the catalog (3-wheel EV, Kore Recovery, utility spine, Kore Air monitor, all concept renders), and Personal Intelligence shaping products. Homepage teaser added. All concept stage, pre-prototype, pre-revenue.

Record 02

Executive Investor Dashboard

Reporting date: October 11, 2026. Every metric below is traceable to the dated log or a cited source. Zeros are real zeros, not omissions.

Development stage
Pre-prototype

Concept stage. No working hardware exists.

Prototypes built
0

No prototype has been constructed.

Tests completed
Not yet measured

No hardware tests have been run.

Revenue to date
$0

Pre-revenue. No customers, no pilots, no LOIs.

Funding goal
$30,000

GoFundMe: "Building Kore for Safer Homes." Funds the V0.1 prototype.

Amount raised
Not yet confirmed

Figure not verified as of Oct 11, 2026. Never invented.

Applications submitted
9

Joules, CTAN, Galaxy, Marshalls, MIT Solve, Coach K, Verizon/LISC, Voqal, RPI capstone.

Patents filed
0

No IP filings. Invention register is empty.

University partnerships confirmed
0

Conversations active with RPI, Purdue, Auburn, Penn State, and others. None confirmed.

Team
1

Founder only. All other roles unassigned.

Open risks
8

Tracked in Record 08 with owners and mitigations.

Next milestone
V0.1 prototype

One-room proof of the Kore loop, funded by the $30K campaign.

Record 03

Product and Subsystem Registers

Every product and subsystem is at concept stage. Nothing below has been built or tested. V0.1 scope is Root plus Seed Sense and Seed Air.

Product / subsystemTypeStageEvidence and notes
Kore RootFoundation hubConceptProposed hub coordinating local sensing and device communication. Architecture defined Sep 2026.
Seed SenseSensor module (V0.1)ConceptTemperature, humidity, light, sound, vibration. Sensor set under evaluation: BME280, PIR motion.
Seed AirSensor module (V0.1)ConceptParticles, VOCs, CO2, temperature, humidity. SGP30 under evaluation.
Seed PresenceSensor module (roadmap)ConceptOccupancy and posture via WiFi CSI plus camera corroboration. Concept render completed Oct 5, 2026.
Seed WaterSensor module (roadmap)ConceptLeak and moisture sensing. Roadmap concept only.
Seed MotionSensor module (roadmap)ConceptRoadmap concept only.
Seed SoundSensor module (roadmap)ConceptRoadmap concept only.
Seed ContactSensor module (roadmap)ConceptRoadmap concept only.
Seed LinkSensor module (roadmap)ConceptRoadmap concept only.
Kore IntelligenceSoftware layerConceptSense, Learn, Detect, Connect, Protect, Insight. Framed Sep 2026. No code written.
Kore SentinelProtection product lineConceptMonitoring, alerting, emergency-response technologies. Concept only.
Kore AirProduct product lineConceptConcept product line. No development started.
Kore WaterProduct product lineConceptConcept product line. No development started.
Kore PlumbingProduct product lineConceptConcept product line. No development started.
KoreBinProduct product lineConceptWaste recovery into labeled material blocks. Concept product line. No development started.
Kore CycleProduct product lineConceptConcept product line. No development started.
Kore GardenProduct product lineConceptConcept product line. No development started.
Kore HomeProduct product lineConceptConcept product line. No development started.
Kore WearProduct product lineConceptConcept product line. No development started.

Hardware path: ESP32 platform. Sensors under evaluation include BME280, SGP30, MAX30102, PIR motion, and WiFi CSI presence. No parts purchased; no bill of materials finalized.

Record 04

Engineering Decisions Log

Only decisions actually made, with the rationale recorded at the time. Alternatives considered are noted where they were weighed.

DateDecisionRationaleApproved by
Sep 2026Root, Seeds, and Growth architecture; ESP32 hardware pathModular ecosystem where one hub coordinates many sensors. ESP32: low-cost, proven silicon with WiFi and Bluetooth.Fact Founder
Oct 1, 2026University-partnership build path instead of the $18,000 firm quoteCapital efficiency at pre-revenue stage; capstone programs provide engineering labor.Fact Founder
Oct 5, 2026Ultra-surveillance positioning as flagship; camera-free option for sensitive settingsUnmatched safety and documentation as the product; schools, churches, and senior living keep a different privacy boundary.Fact Founder
Oct 2026Static site on Cloudflare Pages; Formspree for email captureNear-zero operating cost and no backend to maintain for a pre-revenue marketing site.Fact Founder
Oct 2026No tree-root visual motif in any Kore materialsFounder rejected it. Retired from videos, site, and brand.Fact Founder

Record 05

Prototype and Revision Register

No prototype has been built. The ten development gates below define what "done" means before any product advances. A gate is passed only on objective evidence plus an explicit approval, never on documentation alone.

GateWhat it requiresStatus
1. Concept definitionProblem, customer, solution, requirements, competing approachesConcept Architecture defined; requirements not yet formalized
2. FeasibilityTechnical research, calculations, critical assumptions, cost estimatesNot started
3. ArchitectureSystem diagrams, interfaces, subsystem definitions, component specsNot started
4. Prototype planningBill of materials, tools, methods, software dependencies, test planNot started
5. Prototype developmentBuild activities, revisions, failures, photographsNot started
6. VerificationTests against predefined engineering requirementsNot started
7. ValidationEvidence the product solves the user problem under realistic conditionsNot started
8. Design refinementCorrective actions, reliability, usability, cost optimizationNot started
9. Manufacturing readinessSupplier review, design for manufacture, quality controls, production economicsNot started
10. Commercial readinessCustomer evidence, pricing, distribution, support, regulatory review, launch planNot started

Record 06

Test and Validation Register

No tests have been run on hardware. This register opens with the first V0.1 test plan.

Test IDScopeDateResultEvidence
Not yet measured
No measurements recorded. No test reports exist.

Record 07

Team Responsibilities and Action Tracker

Kore is a solo-founder project. Every role without a name is unassigned. No employees, advisors, or partners are invented here.

RolePersonStatusCurrent focus
Founder and CEOKristian BrownFact ActiveArchitecture, fundraising, partnerships, content, this log
CTO / Systems architectUnassignedOpenFounder covering at concept level
Electrical engineeringUnassignedOpenTarget: university capstone partnership
Mechanical engineeringUnassignedOpenTarget: university capstone partnership
Software engineeringUnassignedOpenFounder covering site and content tooling
Product designUnassignedOpenConcept renders produced by founder with AI tooling
Project managementUnassignedOpenFounder covering via this build log
Commercial strategyUnassignedOpenFounder covering: applications, outreach, pricing TBD

Record 08

Risk, Issue, and Dependency Register

Active record of what could stop or slow the work. Each item has an owner and a mitigation. Updated as items resolve.

Risk / issueSeverityOwnerMitigationStatus
Single-founder execution risk: all work depends on one personHighKristian BrownUniversity capstone partnerships for engineering labor; disciplined build log for continuityOpen
Funding gap: $30,000 V0.1 prototype unfundedHighKristian BrownGoFundMe active; 9 grant, fellowship, and accelerator applications submittedOpen
No prototype: every product claim is unvalidatedHighKristian BrownV0.1 one-room loop is the next measurable milestone; no validation claims made before itOpen
LinkedIn founder account restricted (Oct 10, 2026)MediumKristian BrownFounder completing LinkedIn's own verification; support campaign paused meanwhileOpen
Sheldon Hurst $18,000 build quote awaiting replyMediumKristian BrownUniversity-partnership path runs in parallel; no dependency on this quoteOpen
Decatur Makers visit (Oct 14) and Auburn meeting (Oct 16) outcomes unknownMediumKristian BrownBoth scheduled; outcomes to be logged hereUpcoming
YouTube daily upload limit blocking content publishingLowKristian BrownOne-time phone verification or wait 24 hours for resetOpen
Instagram rate limiting (HTTP 429) on uploadsLowKristian BrownAttempts paused to avoid worsening; retry after cooldownMonitoring

Record 09

Bill of Materials and Cost Register

Only verified figures appear with amounts. Everything else is marked, never estimated silently. Basis and date stated for each line.

ItemBasis and dateAmountClassification
V0.1 prototype build, labor and assemblyThird-party quote, Sheldon Hurst, Oct 2026~$18,000 plus componentsEstimate Awaiting reply
Components and partsNot yet quotedNot yet measuredNo BOM finalized
Development expenditure to date (hardware)Founder records, Oct 2026$0 trackedFact
GoFundMe campaign goalCampaign page, Oct 2026$30,000Fact
Amount raised (GoFundMe)Not verified as of Oct 11, 2026Not yet confirmedNever invented

Record 10

Supplier and Manufacturing Register

No suppliers engaged beyond the single quote below. No manufacturing activity of any kind.

SupplierCategoryEngagementStatus
Sheldon HurstPrototype build servicesQuoted ~$18,000 plus components, Oct 2026Awaiting reply; no engagement beyond the quote
UnassignedComponent suppliersNone contactedNot yet measured
UnassignedManufacturing partnersNone contactedNot yet measured

Record 11

Invention and Intellectual Property Register

The register is empty and shown empty. No concept is described as protected.

InventionContributorsDatesEvidenceLegal status
No filings
No patents filed, no invention disclosures recorded, no prior-art searches commissioned. The register opens with the first documented design.

Record 12

Customer Discovery and Commercial Validation Register

Verifiable commercial activity only: submitted applications and documented conversations. No customers, no pilots, no LOIs, no revenue. Nothing here is a partnership until both sides say so.

ActivityTypeDateOutcome
Joules Accelerator Cohort 18Accelerator applicationOct 4, 2026Fact Submitted
RPI Spring 2027 capstone proposalUniversity partnershipOct 4, 2026Fact Submitted
CTAN: $30K pre-seed SAFE, $1.5M cap, 20% discountAngel network applicationOct 8, 2026Fact Submitted
Galaxy Grant ($2,500)Grant applicationOct 8, 2026Fact Submitted
Marshalls Good Stuff AcceleratorAccelerator applicationOct 8, 2026Fact Submitted
MIT Solve, solution 117672Competition applicationOct 8, 2026Fact Submitted
Coach K Legacy Grant ($1,000)Grant applicationOct 9, 2026Fact Submitted
Verizon / LISC Small Business Grant ($10,000)Grant applicationOct 9, 2026Fact Submitted
Voqal Fellowship ($30,000)Fellowship applicationOct 9, 2026Fact Submitted
Purdue UniversityUniversity capstone2026Spring sponsorship package sent; four-question reply sent Oct 9
Auburn EngineeringUniversity capstone2026Meeting offered Fri Oct 16 after 11 AM; unconfirmed
Penn State Learning FactoryUniversity capstone2026Fit call scheduled Oct 6; no outcome reported
Georgia SouthernUniversity senior design2026Sponsorship quoted at $2,500 per semester
Georgia Tech, Kennesaw State, UGA, Cal PolyUniversity outreach2026Contact made; UGA 2027-28 cycle opens January 2027
thekorevision.comOwned channelOct 8, 2026Live; email list building, count not yet measured
TikTok, Instagram, YouTubeOwned channelsOct 2026Active; audience metrics not yet measured

Record 13

Milestone and Development Roadmap

Each milestone states its acceptance criteria. A milestone is met only when the criteria are evidenced, never on documentation alone.

MilestoneTargetAcceptance criteriaStatus
$30,000 prototype campaign fundedTBD$30,000 raised via GoFundMeIn progress; raised amount not yet confirmed
Decatur Makers visitOct 14, 2026Build night scouted for first prototypeScheduled
Auburn Engineering meetingOct 16, 2026Capstone proposal discussion heldOffered; unconfirmed
V0.1 prototype: one-room Kore loopAfter fundingSense, compare, act, verify, record demonstrated and published on videoNot started
Pilot programsAfter prototype proofReal rooms tested with documented feedbackNot started

Record 14

Investor Updates and Funding Requirements

What the project needs, what it enables, and the basis for every figure. Updated each reporting period.

ItemDetail
Funding required$30,000. Basis: founder estimate; third-party build quote of ~$18,000 plus components (Sheldon Hurst, Oct 2026).
Use of fundsParts, assembly, and the first working Kore loop: sense, compare, act, verify, record. Documented in the open.
Active raiseGoFundMe: "Building Kore for Safer Homes." Amount raised not yet confirmed.
Applications in flight9 submitted (see Record 12): Joules, CTAN, Galaxy, Marshalls, MIT Solve, Coach K, Verizon/LISC, Voqal, RPI capstone.
What $30K enablesThe first measurable milestone: a working one-room loop, demonstrated on video, which unlocks pilot programs.
What is NOT needed yetManufacturing capital, team hiring, or paid marketing. Those follow prototype proof.
ContactKristian Brown, Founder and CEO. thekorevision.com

Reporting period: October 11, 2026. Progress since last update: site rebuilt into five pages, Daily Double episode 1 produced, Master Build Log published. Nothing invented; see Record 01 for the dated history.

Maintained record

This log is maintained by Mr. Kristian Brown, Founder & CEO of Kore. Last updated October 11, 2026.